Wel Come to Nanded Waghala City Municipal Corporation...

Wel Come

 

Home

 

City Development Plan

Introduction
Introduction to Nanded City
City Assessment
City Assessment
Education and Health
Pilgrim / Religious Tourism
City Structure and Growth Management
Heritage Restoration and Conservation
Water Supply
Sewerage & Sanitation
Transportation
Street Lighting
Fire, Housing and Other Services
Education
Urban Basic Services in Slums
Municipal Finances
 
Nanded Vision 2025
[City Development Strategy]
Nanded Vision 2025
 
Project Identification & Capital Investment Plan
Project Identification & Capital Investment Plan
Summary of Estimated Investment Requirement & Phasing [PDF]
 
Assessment of Investment Sustenance of NWCMC
Assessment of Investment Sustenance of NWCMC
 
Ongoing Project Development Initiatives
Ongoing Project Development Initiatives
 
Home


 

               

I. Ongoing Project Development Initiatives

                        NWCMC has already initiated preparation of sectoral master plans and detailed project reports across most sectors.  NWCMC does not have the required institutional capabilities for project planning and development – they have engaged Infrastructure Leasing & Financial Services Limited (IL&FS) as their Program Manager, considering the scale and complexities involved in the proposed developments.  IL&FS is mandated to develop projects and manage their implementation upto commissioning.  IL&FS has also committed in principle to fund NWCMC for its external borrowing requirements.

                        Some of the key project development initiatives underway under this engagement are briefly described hereunder.

1.1.            Riverfront Development Project

                        NWCMC is carrying out a detailed master planning for the entire riverfront on either banks of the River Godavari on either banks, within the city limits.  The focus of the master plan is to revive the River Godavari in Nanded through water retention and interventions aimed at enhancing the functional and scenic heritage of the river.  Special attention is being laid on the zoning plan, so as to ensure reviving and conservation of the inner city fabric in the core city area along the river banks.  Other interventions include development of ghats, public spaces, gardens, eco parks, botanical garden, mela ground, stadium, etc. on either bank.  Figure 8 presents a preliminary concept option for the riverfront development.

River MAP

 

 

Figure 9: Glimpses of Proposed Riverfront Development Components

 


 

 

1.1.1.      Project Development Timelines

Sl.

Milestone

Date

Remark

1

Field Surveys

18.06.2006

Completed

2

Concept Plan Options

15.06.2006

Completed

3

Detailed Master Plan

31.07.2006

Underway

4

Detailed Engineering Report for selected components

15.10.2006

underway

 1.2.            Water Supply

                        The scope of work entails improvements to the water supply system in Nanded.  Specific sub-project components being addressed include:

a.       For South Nanded

i.                  Source creation and water treatment plant

ii.                 Pumping machinery at source and at WTP

iii.               Transmission main

iv.               New service reservoirs within town

v.                Distribution system

vi.               Additional infrastructure for point loads

b.       For North Nanded

i.                  Improvement & augmentation of source

ii.                 Improvement & augmentation of WTP

iii.               Improvement & augmentation of pump sets at source (WTP)

iv.               Transmission main

v.                Additional service reservoirs (ELSR and/or GLSR)

vi.               Capacity addition of distribution system

vii.             Rehabilitation of distribution system (pipes & valves)

viii.            Rehabilitation of house service connections

 1.2.1.      Project Development Timelines

Sl.

Milestone

Date

Remark

1

Master Plan for Water Supply

30.06.2006

Underway

2

Detailed Engineering Report for South Nanded

 

 

 

  Source creation and Water Treatment Plant; Pumping Machinery at source and at WTP; and Transmission main

15.08.06

Underway

 

  New Service Reservoirs within Town; and Distribution System

31.07.06

Underway

 

  Additional infrastructure for point loads

15.08.06

Underway

3

Detailed Engineering Report for North Nanded

 

Underway

 

  Improvement & Augmentation of Source; and Additional service reservoirs (ELSR and/or GLSR)

15.07.06

Underway

 

  Improvement & Augmentation of WTP; and Improvement & Augmentation of Pump sets at source (WTP)

31.07.06

Underway

 

  Transmission main; and Capacity addition of Distribution System

15.08.06

Underway

 

  Rehabilitation of Distribution System (Pipes & Valves); and Rehabilitation of House Service Connections

15.09.06

Underway

 1.3.            Sewerage & Sanitation

                        The scope of work entails improvements to the sewerage system in Nanded.  Specific sub-project components being addressed include:

a.       For South Nanded

i.                  Collection System

ii.                 Sewage Pumping Stations

iii.               Sewage Treatment Plant

b.       For North Nanded

i.                  Improvement & Augmentation of the existing system – collection, pumping and treatment systems

ii.                 Extension of the collection system to uncovered areas

 1.3.1.      Project Development Timelines

Sl.

Milestone

Date

Remark

1

Master Plan for Sewerage System

30.06.2006

Underway

2

Detailed Engineering Report for South Nanded

 

 

 

  Collection system for Priority Zone

31.07.06

Underway

 

  Collection system for Other Zones

31.08.06

Underway

 

  Sewage Pumping Station; and Sewage Treatment plant

15.09.06

Underway

3

Detailed Engineering Report for North Nanded

 

Underway

 

  Condition assessment of existing system

15.07.06

Underway

 

  Collection system

15.08.06

Underway

 

  Improvement & Augmentation of pumping stations; and Improvement & Augmentation of Sewage Treatment Plant

15.09.06

Underway

1.4.            Storm Water Drainage

                        The project entails design and development of a storm water management and drainage system Nanded.  There are about 26 major nallahs that drain the city’s storm water into the river.  The plan is to assess the capacity of these nallahs and the tertiary storm water network to effectively drain out all surface runoff, and to ensure minimal flooding.

1.4.1.      Project Development Timelines

Sl.

Milestone

Date

Remark

1

Master Plan for Storm Water Drainage

30.06.2006

 

2

Detailed Engineering Report for Storm Water Drainage

15.10.2006

 

 1.5.            Transportation Infrastructure

                        The scope of work for project preparation for transport infrastructure is focused on strengthening, widening and beautification of existing arterial roads.  The widening proposal is based on the proposed Development Plan widths.  There are about 40 such priority roads measuring about 60 km.  In addition detailed project reports are being prepared for three RoBs and one major bridge across the River Godavari.  These proposed interventions are critical from the point of view of the Gur ta Gaddi Tercentenary celebrations’ circulation requirements as also in the context of city-wide transportation network.  The detailed project reports for these components will be finalized by August

 31, 2006.

 

View Figure 10: Priority Roads for the Gur ta Gaddi Tercentenary Celebrations

 




14/Aug/2006